{"id":19770,"date":"2015-06-16T11:50:00","date_gmt":"2015-06-16T11:50:00","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=19770"},"modified":"2015-06-16T11:50:00","modified_gmt":"2015-06-16T11:50:00","slug":"nhpc-restores-4th-unit-of-uri-ii-power-station-in-jammu-kashmir","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/nhpc-restores-4th-unit-of-uri-ii-power-station-in-jammu-kashmir\/","title":{"rendered":"NHPC restores 4th unit of Uri-II power station in Jammu &#038; Kashmir"},"content":{"rendered":"<p>State-owned NHPC has restored a unit of the Uri-II power station in Baramulla district, Jammu &#038; Kashmir, which had been shut down following a fire incident in November last year. <\/p>\n<p>The Unit-4 is the first turbine that has been made operational after a fire broke out at the plant in November last year. All four units of the plant were shut after the incident and the company is working on to restore remaining 3 units of the plant. <\/p>\n<p>&#8220;One unit (i.e. Unit # 4) of URI-II Power Station has been restored on June 15, 2015 after the fire incident occurred on November 20, 2014,&#8221; NHPC Ltd said is BSE filing. <\/p>\n<p>Uri-II power station (4X 60MW) is a run-of-the-river project which is located in Uri Tehsil of Baramulla District. <\/p>\n<p>The project has been designed to make use of Jhelum waters at a gross head of about 130m following the discharge of Uri-I tail water upstream. <\/p>\n<p>The powerhouse cavern of the plant is 133m long, 15m wide and 40m high. The powerhouse accommodates four Francis vertical turbines of 60MW capacity each. <\/p>\n<p>The Power station is close to the Line of Actual Control (LAC). The power station is designed to generate 1,124 million units in a 90 per cent dependable year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned NHPC has restored a unit of the Uri-II power station in Baramulla district, Jammu &#038; Kashmir, which had been shut down following a fire incident in November last year. The Unit-4 is the first turbine that has been made operational after a fire broke out at the plant in November last year. All four units of the plant were shut after the incident and the company is working on to restore remaining 3 units of the plant. &#8220;One unit (i.e. Unit # 4) of URI-II Power Station has been restored on June 15, 2015 after the fire incident occurred [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-19770","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/19770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=19770"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/19770\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=19770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=19770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=19770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}