{"id":19764,"date":"2015-06-16T11:49:27","date_gmt":"2015-06-16T11:49:27","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=19764"},"modified":"2015-06-16T11:49:27","modified_gmt":"2015-06-16T11:49:27","slug":"wind-sector-to-add-over-3500-mw-capacity-in-2015-16","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/wind-sector-to-add-over-3500-mw-capacity-in-2015-16\/","title":{"rendered":"Wind sector to add over 3,500 MW capacity in 2015-16"},"content":{"rendered":"<p>Wind energy turbine manufacturers expect additional installation of over 3,500 mega watt (MW) in 2015-16.<\/p>\n<p>Madhusudan Khemka, chairman, Indian Wind Turbine Manufacturers Association (IWTA) said that in 2014-15, the wind energy sector saw addition of 2,310 MW.<\/p>\n<p>He added that the figure could have been higher if some of the state-related issues had been resolved in time.<\/p>\n<p>In a letter in an internal magazine of the association, he said the market response to the delayed announcement of Accelerated Depreciation (AD) was good, adding that the AD market will cross 1 GW in 2015-16.<\/p>\n<p>Khemka said, &#8220;Incentives of AD, GBI (Generation Based Incentive) and 80 IA benefits have enhanced investments.&#8221;<\/p>\n<p>&#8220;Irrespective of the policies at the Centre, the urgent need of the hour is to work with wind states and mainstream wind power,&#8221; he added, pointing out that power evacuation and land are the major impediments to project execution.  <\/p>\n<p>Raghuram Sachidanandam, AVP &#8211; Government Relations &#038; Regulatory Affairs Department at Gamesa Wind Turbines in the magazine explained that both the incentives are mutually exclusive and investors can choose either AD or GBI. <\/p>\n<p>In 2011-12, the industry installed 3,200 MW with both incentives and in the absence of AD and GBI, it came down as low as 1,700 MW in 2012-13.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Wind energy turbine manufacturers expect additional installation of over 3,500 mega watt (MW) in 2015-16. Madhusudan Khemka, chairman, Indian Wind Turbine Manufacturers Association (IWTA) said that in 2014-15, the wind energy sector saw addition of 2,310 MW. He added that the figure could have been higher if some of the state-related issues had been resolved in time. In a letter in an internal magazine of the association, he said the market response to the delayed announcement of Accelerated Depreciation (AD) was good, adding that the AD market will cross 1 GW in 2015-16. Khemka said, &#8220;Incentives of AD, GBI (Generation [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-19764","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/19764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=19764"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/19764\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=19764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=19764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=19764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}