{"id":16487,"date":"2015-05-25T11:26:42","date_gmt":"2015-05-25T11:26:42","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=16487"},"modified":"2015-05-25T11:26:42","modified_gmt":"2015-05-25T11:26:42","slug":"bhel-adds-736-mw-hydroelectric-capacity-in-2014-15","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-adds-736-mw-hydroelectric-capacity-in-2014-15\/","title":{"rendered":"BHEL adds 736 MW hydroelectric capacity in 2014-15"},"content":{"rendered":"<p>New Delhi: Bharat Heavy Electricals Ltd (BHEL) today said it commissioned six hydro sets with a combined 736 MW capacity in 2014-15.<\/p>\n<p>This accounts for 100 per cent of hydro power capacity addition in the country in the said fiscal, BHEL said in a statement.<\/p>\n<p>Also, the highest addition in a single year by BHEL over the last decade, this was achieved by commissioning of projects of three major central utilities &#8212; NTPC, NHPC and SJVNL &#8212; it added. <\/p>\n<p>The projects commissioned include two units (200 MW each) of Koldam Hydro Electric Project (HEP), with which NTPC has made its maiden foray into the hydro sector.<\/p>\n<p>On top of that, a 130-MW unit of NHPC&#8217;s Parbati III HEP and 3 units of SJVNL&#8217;s Rampur (68.67 MW each) were started.<\/p>\n<p>BHEL is executing three other hydro projects of NTPC \u2013 Tapovan Vishnugad HEP (4&#215;130 MW), Lata Tapovan HEP (3&#215;57 MW) and Rammam Stage-III HEP (3&#215;40 MW), with a fourth unit of 4&#215;130 MW Parbati III HEP being commissioned.<\/p>\n<p>In addition, BHEL has started the last three units of Rampur HEP of SJVN.<\/p>\n<p>These HEPs will contribute to reduction in the greenhouse gas emission and help in achieving a low carbon development path, the statement read.<\/p>\n<p>BHEL also bagged orders for two major hydro projects aggregating 564 MW in 2014-15 and has so far commissioned some 400 hydro generating sets in the country, with a cumulative capacity of more than 19,600 MW.<\/p>\n<p>It is currently executing hydro power projects of around 4,600 MW, which are at various stages of implementation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi: Bharat Heavy Electricals Ltd (BHEL) today said it commissioned six hydro sets with a combined 736 MW capacity in 2014-15. This accounts for 100 per cent of hydro power capacity addition in the country in the said fiscal, BHEL said in a statement. Also, the highest addition in a single year by BHEL over the last decade, this was achieved by commissioning of projects of three major central utilities &#8212; NTPC, NHPC and SJVNL &#8212; it added. The projects commissioned include two units (200 MW each) of Koldam Hydro Electric Project (HEP), with which NTPC has made its [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-16487","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/16487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=16487"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/16487\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=16487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=16487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=16487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}