{"id":154466,"date":"2018-03-21T11:32:17","date_gmt":"2018-03-21T11:32:17","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=154466"},"modified":"2018-03-21T11:32:17","modified_gmt":"2018-03-21T11:32:17","slug":"gujarat-industries-power-co-issue-loi-to-bhel-for-75-mw-solar-power-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/gujarat-industries-power-co-issue-loi-to-bhel-for-75-mw-solar-power-project\/","title":{"rendered":"Gujarat Industries Power Co issue LoI to Bhel for 75 MW solar power project"},"content":{"rendered":"<p>Gujarat Industries Power Co has issued a Letter of Intent dated 19 March 2018 to Bharat Heavy Electricals (BHEL) for Design, Engineering, Supply &amp; Procurement, Construction, Erection, Testing, Commissioning and Operation &amp; Maintenance (O&amp;M) of 75 MW (AC) Solar Power Project at Gujarat Solar Park, Charanka, Dist: Patan in Gujarat, on Engineering, Procurement and Construction (EPC) Basis.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gujarat Industries Power Co has issued a Letter of Intent dated 19 March 2018 to Bharat Heavy Electricals (BHEL) for Design, Engineering, Supply &amp; Procurement, Construction, Erection, Testing, Commissioning and Operation &amp; Maintenance (O&amp;M) of 75 MW (AC) Solar Power Project at Gujarat Solar Park, Charanka, Dist: Patan in Gujarat, on Engineering, Procurement and Construction (EPC) Basis.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-154466","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/154466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=154466"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/154466\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=154466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=154466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=154466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}