{"id":154094,"date":"2018-03-19T11:52:08","date_gmt":"2018-03-19T11:52:08","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=154094"},"modified":"2018-03-19T11:52:29","modified_gmt":"2018-03-19T11:52:29","slug":"bhel-commissions-1st-unit-of-kishanganga-hydro-project-in-jk","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-commissions-1st-unit-of-kishanganga-hydro-project-in-jk\/","title":{"rendered":"Bhel commissions 1st unit of Kishanganga hydro project in J&amp;K"},"content":{"rendered":"<p>State-run power equipment maker Bhel today said it has commissioned first unit of 110 MW of the Kishanganga hydro-electric project (HEP) of NHPC in Jammu and Kashmir.<\/p>\n<p>Located on the river Kishanganga, a tributary of the Jhelum in Bandipora district, all the three units of the 340 MW project will generate 1,350 million units (MU) of clean electricity annually, a Bhel statement said. <\/p>\n<p>The other two units are also in advanced stages of commissioning.<\/p>\n<p>Bhel was entrusted with execution of the Electro-Mechanical (E&amp;M) package for the project comprising design, manufacture, supply, installation and commissioning of Vertical Shaft Pelton Turbines and matching synchronous Generators, Controls &amp; Monitoring (SCADA) System along with electrical and mechanical auxiliaries.<\/p>\n<p>The equipment was supplied from Bhel&#8217;s manufacturing units at Bhopal, Jhansi, Rudrapur and Bengaluru while the execution of works on site was carried out by the company&#8217;s Power Sector Northern Region division and Transmission Business Group.<\/p>\n<p>In J&amp;K, Bhel has so far commissioned 31 Hydro sets with a cumulative capacity of 1,257 MW.<\/p>\n<p>It is executing hydroelectric projects of more than 2,900 MW in the country and 2,940 MW in Bhutan which are at various stages of implementation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-run power equipment maker Bhel today said it has commissioned first unit of 110 MW of the Kishanganga hydro-electric project (HEP) of NHPC in Jammu and Kashmir. Located on the river Kishanganga, a tributary of the Jhelum in Bandipora district, all the three units of the 340 MW project will generate 1,350 million units (MU) of clean electricity annually, a Bhel statement said. The other two units are also in advanced stages of commissioning. Bhel was entrusted with execution of the Electro-Mechanical (E&amp;M) package for the project comprising design, manufacture, supply, installation and commissioning of Vertical Shaft Pelton Turbines and [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-154094","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/154094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=154094"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/154094\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=154094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=154094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=154094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}