{"id":149670,"date":"2018-02-16T11:43:59","date_gmt":"2018-02-16T11:43:59","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=149670"},"modified":"2018-02-16T11:43:59","modified_gmt":"2018-02-16T11:43:59","slug":"bhel-commissions-18-mw-hydro-electric-project-in-punjab","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-commissions-18-mw-hydro-electric-project-in-punjab\/","title":{"rendered":"BHEL commissions 18 MW hydro-electric project in Punjab"},"content":{"rendered":"<p>State-run power equipment maker BHEL today said it has commissioned 18 megawatt (MW) Mukerian hydro-electric project (HEP) in Punjab. <\/p>\n<p>&#8220;With the commissioning of the second 9 MW hydro generating unit, Bharat Heavy Electricals Ltd (BHEL) has successfully commissioned the 18 MW Mukerian hydro-electric project (HEP) stage-II in Punjab,&#8221; the company said in a regulatory filing. <\/p>\n<p>Located on the Mukerian canal in Hoshiarpur district of Punjab, the 18 MW Mukerian project is a surface powerhouse of Punjab State Power Corporation Ltd (PSPCL). <\/p>\n<p>&#8220;The generation from Mukerian HEP stage-II will contribute significantly in reduction of greenhouse gas emissions and will help in achieving a low carbon development path for the nation,&#8221; the company added. <\/p>\n<p>The first unit of the Mukerian HEP was commissioned in May last year. <\/p>\n<p>Shares of BHEL were trading 0.16 per cent higher at Rs 94.85 on BSE.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-run power equipment maker BHEL today said it has commissioned 18 megawatt (MW) Mukerian hydro-electric project (HEP) in Punjab. &#8220;With the commissioning of the second 9 MW hydro generating unit, Bharat Heavy Electricals Ltd (BHEL) has successfully commissioned the 18 MW Mukerian hydro-electric project (HEP) stage-II in Punjab,&#8221; the company said in a regulatory filing. Located on the Mukerian canal in Hoshiarpur district of Punjab, the 18 MW Mukerian project is a surface powerhouse of Punjab State Power Corporation Ltd (PSPCL). &#8220;The generation from Mukerian HEP stage-II will contribute significantly in reduction of greenhouse gas emissions and will help in [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-149670","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/149670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=149670"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/149670\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=149670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=149670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=149670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}