{"id":149043,"date":"2018-02-12T11:17:16","date_gmt":"2018-02-12T11:17:16","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=149043"},"modified":"2018-02-12T11:17:16","modified_gmt":"2018-02-12T11:17:16","slug":"lt-hydrocarbon-engineering-bags-orders-worth-over-rs-2200-crore","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-hydrocarbon-engineering-bags-orders-worth-over-rs-2200-crore\/","title":{"rendered":"L&amp;T Hydrocarbon Engineering bags orders worth over Rs 2,200 Crore"},"content":{"rendered":"<p>Larsen &amp; Toubro&#8217;s hydrocarbon engineering arm has bagged an order worth over Rs 2,200 crore from Al Dhafra Petroleum Operations Company of Abu Dhabi, the engineering major said in a statement Monday. <\/p>\n<p>The order entails engineering, procurement and construction work for field development for Al Dhafra Petroleum, which is a joint venture between ADNOC and Korea National Oil Corporation (KNOC) and GS Energy. <\/p>\n<p>L&amp;T Hydrocarbon Engineering said the the scope of the contract includes engineering, procurement, construction and commissioning of flow lines, gathering facilities and pipelines to transfer crude oil &amp; gas from Haliba fields to processing facility at Asab and installation of 132 kV and 33 kV overhead electrical transmission lines to supply power.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Larsen &amp; Toubro&#8217;s hydrocarbon engineering arm has bagged an order worth over Rs 2,200 crore from Al Dhafra Petroleum Operations Company of Abu Dhabi, the engineering major said in a statement Monday. The order entails engineering, procurement and construction work for field development for Al Dhafra Petroleum, which is a joint venture between ADNOC and Korea National Oil Corporation (KNOC) and GS Energy. L&amp;T Hydrocarbon Engineering said the the scope of the contract includes engineering, procurement, construction and commissioning of flow lines, gathering facilities and pipelines to transfer crude oil &amp; gas from Haliba fields to processing facility at Asab [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[133],"tags":[],"class_list":["post-149043","post","type-post","status-publish","format-standard","hentry","category-oil-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/149043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=149043"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/149043\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=149043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=149043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=149043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}