{"id":127926,"date":"2017-08-29T10:35:55","date_gmt":"2017-08-29T10:35:55","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=127926"},"modified":"2017-08-29T10:39:17","modified_gmt":"2017-08-29T10:39:17","slug":"one-kudankulam-n-power-unit-restarts-generation","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/one-kudankulam-n-power-unit-restarts-generation\/","title":{"rendered":"One Kudankulam n-power unit restarts generation"},"content":{"rendered":"<p>The first 1,000 MW atomic power unit at the Kudankulam Nuclear Power Project (KNPP) restarted generation after completion of refuelling on Tuesday, said an official. <\/p>\n<p>&#8220;The first 1,000 MW atomic power unit was synchronised with the grid between 6.30 a.m and 7 a.m. today (Tuesday). The power generation is around 300 MW,&#8221; the official told IANS. <\/p>\n<p>According to him, some tests have to be done as the unit was refuelled. <\/p>\n<p>The power generation would be increased in a gradual manner, he added. <\/p>\n<p>The first unit was shut down on April 13 for annual maintenance and refuelling. <\/p>\n<p>Every year, one third of the reactor&#8217;s 163 fuel assemblies, or 54 assemblies, are replaced. <\/p>\n<p>This was the second refuelling cycle for Unit 1. <\/p>\n<p>Meanwhile, the second 1,000 MW unit that was shutdown on August 4 due to hydrogen concentration problem in stator is yet to restart. <\/p>\n<p>India&#8217;s atomic power plant operator Nuclear Power Corporation of India Ltd (NPCIL) has two 1,000 MW nuclear power plants at the KNPP built with Russian equipment. <\/p>\n<p>Kudankulam is in Tirunelveli district around 650 km from here. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first 1,000 MW atomic power unit at the Kudankulam Nuclear Power Project (KNPP) restarted generation after completion of refuelling on Tuesday, said an official. &#8220;The first 1,000 MW atomic power unit was synchronised with the grid between 6.30 a.m and 7 a.m. today (Tuesday). The power generation is around 300 MW,&#8221; the official told IANS. According to him, some tests have to be done as the unit was refuelled. The power generation would be increased in a gradual manner, he added. The first unit was shut down on April 13 for annual maintenance and refuelling. Every year, one third [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-127926","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/127926","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=127926"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/127926\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=127926"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=127926"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=127926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}