{"id":112743,"date":"2017-05-16T10:50:22","date_gmt":"2017-05-16T10:50:22","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=112743"},"modified":"2017-05-16T10:50:22","modified_gmt":"2017-05-16T10:50:22","slug":"bhel-bags-rs-233-crore-order-for-steam-and-power-generation-from-rfcl","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bhel-bags-rs-233-crore-order-for-steam-and-power-generation-from-rfcl\/","title":{"rendered":"BHEL bags Rs 233 crore order for steam and power generation from RFCL"},"content":{"rendered":"<p>State-owned power equipment maker BHEL on Tuesday said it has won Rs 233 crore order for a steam and power generation package from Ramagundam Fertilizers and Chemicals Ltd (RFCL).<\/p>\n<p>&#8220;Valued at Rs 233 crore, the order has been placed on BHEL for setting up the package at RFCL&#8217;s fertilizer plant at Ramagundam in Telangana,&#8221; BHEL said in a press statement.  <\/p>\n<p>The scope of the contract includes design, manufacture and commissioning of a 32.5 MW Gas Turbine, 125 TPH Heat Recovery Steam Generator, 85 TPH Utility Boiler and Balance of Plant (BoP) Package along with associated auxiliaries on Lumpsum Turnkey (LSTK) basis.<\/p>\n<p>The equipment for this package will be supplied by the BHEL&#8217;s manufacturing units at Hyderabad, Vizag, Bhopal, Jhansi, Bengaluru, Trichy and Chennai.<\/p>\n<p>The erection and commissioning of the project will be undertaken by the company&#8217;s Power Sector Western Region, Nagpur, it said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned power equipment maker BHEL on Tuesday said it has won Rs 233 crore order for a steam and power generation package from Ramagundam Fertilizers and Chemicals Ltd (RFCL). &#8220;Valued at Rs 233 crore, the order has been placed on BHEL for setting up the package at RFCL&#8217;s fertilizer plant at Ramagundam in Telangana,&#8221; BHEL said in a press statement. The scope of the contract includes design, manufacture and commissioning of a 32.5 MW Gas Turbine, 125 TPH Heat Recovery Steam Generator, 85 TPH Utility Boiler and Balance of Plant (BoP) Package along with associated auxiliaries on Lumpsum Turnkey (LSTK) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-112743","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/112743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=112743"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/112743\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=112743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=112743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=112743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}