{"id":10877,"date":"2015-04-17T11:50:27","date_gmt":"2015-04-17T11:50:27","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=10877"},"modified":"2015-04-17T11:50:27","modified_gmt":"2015-04-17T11:50:27","slug":"oil-india-commissions-54-mw-wind-energy-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/oil-india-commissions-54-mw-wind-energy-project\/","title":{"rendered":"Oil India commissions 54 MW wind energy project"},"content":{"rendered":"<p>New Delhi: Oil India, the nation&#8217;s second largest state-owned oil explorer, today said it has commissioned a 54 MW wind energy project in Gujarat and Madhya Pradesh.<\/p>\n<p>Saddled between the two states, the project is split between a 16 MW capacity plant at Patan in Gujarat and a 38 MW at Chandgarh in Madhya Pradesh, the company said in a statement.<\/p>\n<p>The project costs Rs 439 crore &#8212; Rs 126.5 crore for the Gujarat side and Rs 312.45 crore for the Madhya Pradesh location.<\/p>\n<p>&#8220;With this, OIL&#8217;s installed renewable energy capacity (commercial wind energy and solar energy projects) stands at an impressive 126.60 MW,&#8221; it said.<\/p>\n<p>OIL said the Patan wing of the project was commissioned on March 26 while the Chandgarh site was commissioned on March 31.<\/p>\n<p>&#8220;The Project, fully funded by OIL, is being run by Gamesa Wind Turbines, Chennai, who are the project developers. The Project Management consultants are Power and Energy Consultants, New Delhi,&#8221; it added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi: Oil India, the nation&#8217;s second largest state-owned oil explorer, today said it has commissioned a 54 MW wind energy project in Gujarat and Madhya Pradesh. Saddled between the two states, the project is split between a 16 MW capacity plant at Patan in Gujarat and a 38 MW at Chandgarh in Madhya Pradesh, the company said in a statement. The project costs Rs 439 crore &#8212; Rs 126.5 crore for the Gujarat side and Rs 312.45 crore for the Madhya Pradesh location. &#8220;With this, OIL&#8217;s installed renewable energy capacity (commercial wind energy and solar energy projects) stands at [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-10877","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/10877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=10877"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/10877\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=10877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=10877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=10877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}