HYDERABAD: Construction work on Hyderabad’s 2.62-km-long steel bridge, spanning from Indira Park to VST Main Road, is progressing rapidly. The bridge is expected to be ready within the next three months. The steel bridge is designed to alleviate traffic congestion at Indira Park, Ashok Nagar, RTC X Roads, VST Junction, Musheerabad, and Azamabad.