The BDA has started preliminary work to build the railway underbridge (RuB) at Challaghatta, a vital link between Nadaprabhu Kempegowda Layout and Mysuru Road.
The proposed underbridge will connect the tunnel road that the metro is building right below the depot.
The RuB is part of the new 10.7-km major arterial road (MAR) slated to connect Magadi Road and Mysuru Road. The Bangalore Development Authority (BDA) has roped in Star Infratech to construct the RuB at an estimated cost of Rs 39 crore.